FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦
Request a Quote→778-403-6987→
Free tool for builders

Framing Material
Take-Off Calculator

Rough studs, plates and sheathing sheets for a run of wall. Handy for early budgeting conversations with your GC or supplier. If you would rather have the panels built for you, send us the plans.

ft
ft
sq ft
in

On centre, per your drawings.

%

Your own allowance for cuts and culls.

ft
Studs (incl. waste)
101
Straight run only, before corners and openings
Plate pieces
25
396 linear ft of plate at 16 ft stock
Sheathing sheets
33
960 sq ft net wall area before waste
Request a Quote →Request a Quote

Rough planning aid only. Sheathing is counted as 4 ft by 8 ft sheets (32 sq ft). Plates are one bottom plate plus a double top plate. Corners, headers, blocking and engineered members are not included. OG Prefab is a prefab wall panel, framing and foundation company serving builders, developers and homeowners directly. This tool does not produce a quote, and no pricing is implied.

More Free Tools

Prefab vs. Stick-Built Calculator

Compare framing days and carrying costs between a prefab panel install and traditional stick framing on your project size.

Rain Delay Cost Calculator

Estimate what standing crew time and carrying costs could add up to while a stick-built frame sits open to the weather.

Build Timeline Estimator

Get a rough phase-by-phase schedule from permitting through handover, and see how framing method shifts the timeline.

Owner-Builder vs. GC Comparator

See how self-managed trade overruns and your own time stack up against a general contractor's markup.

Wall Panel Take-Off Estimator

Turn linear feet and wall height into wall area, a rough panel count and stud count before you send plans out.

Panel Delivery Load Planner

Estimate panels per truck load and the number of loads for your job, to start the delivery conversation.

Schedule Float Planner

Compare expected weather-lost days against the float in your schedule, using your own assumptions.

Wall Panel Weight Estimator

Estimate how much a framed and sheathed wall panel weighs, so crane and delivery conversations start from a real number.

Wall Effective R-Value Estimator

See how framing lowers the R-value of an insulated stud wall, and what continuous exterior insulation does to it.

Excavation Volume Calculator

Work out the dig volume, the loose volume after swell and the truckloads to haul for a foundation excavation.

Foundation Concrete Calculator

Add up the concrete in footings, foundation walls, pads and a slab, in cubic metres with an ordering allowance.