FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦
Request a Quote→778-403-6987→
Free tool for builders

Wall Panel
Take-Off Estimator

Enter the total length of exterior or interior wall you plan to frame and get a rough wall area, panel count and stud count. Use it to size up a job before you send plans to a panel shop. For a real take-off, we work from your drawings through our plan-in, panels-out order.

ft

Add up every wall run to be panelized.

ft
sq ft

Combined window and door area to subtract from gross wall area.

ft

Set by your lifting method, truck and crane access. Confirm with the panel shop.

in

On centre, per your drawings.

Gross wall area
1,620 sq ft
1,460 sq ft after openings
Approximate panel count
12
about 15 ft average panel length
Field studs (approx.)
136
Straight run only, before corners and openings
Request a Quote →Request a Quote

Rough planning aid only, based on the numbers you enter. It ignores corners, intersections, headers, jack studs and engineered members, which your drawings will define. OG Prefab is a prefab wall panel, framing and foundation company serving builders, developers and homeowners directly. This tool does not produce a quote, and no pricing is implied.

More Free Tools

Prefab vs. Stick-Built Calculator

Compare framing days and carrying costs between a prefab panel install and traditional stick framing on your project size.

Rain Delay Cost Calculator

Estimate what standing crew time and carrying costs could add up to while a stick-built frame sits open to the weather.

Build Timeline Estimator

Get a rough phase-by-phase schedule from permitting through handover, and see how framing method shifts the timeline.

Owner-Builder vs. GC Comparator

See how self-managed trade overruns and your own time stack up against a general contractor's markup.

Framing Material Take-Off

Rough studs, plates and sheathing sheets for a wall run, with a waste allowance you set.

Panel Delivery Load Planner

Estimate panels per truck load and the number of loads for your job, to start the delivery conversation.

Schedule Float Planner

Compare expected weather-lost days against the float in your schedule, using your own assumptions.

Wall Panel Weight Estimator

Estimate how much a framed and sheathed wall panel weighs, so crane and delivery conversations start from a real number.

Wall Effective R-Value Estimator

See how framing lowers the R-value of an insulated stud wall, and what continuous exterior insulation does to it.

Excavation Volume Calculator

Work out the dig volume, the loose volume after swell and the truckloads to haul for a foundation excavation.

Foundation Concrete Calculator

Add up the concrete in footings, foundation walls, pads and a slab, in cubic metres with an ordering allowance.