FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦
Request a Quote→778-403-6987→
Free tool for builders

Prefab Panel
Delivery Load Planner

Estimate how many wall panels fit on a truck bed when laid flat and stacked, and how many loads a job might need. Real loading depends on weight limits, strapping, routes and the carrier, so treat this as a starting point for the delivery conversation. Plan crane and access with your panel order.

ft
ft
in

Wall depth including sheathing.

ft
ft
in

Your carrier sets this. Confirm before relying on it.

Approximate panels per load
24
3 per layer x 8 layers
Loads for this job
2
for 40 panels
Request a Quote →Request a Quote

Approximate only. This tool does not check weight, legal height or width limits, permits or route restrictions. Panels are assumed laid flat; confirm the loading method and limits with your panel supplier and carrier. OG Prefab is a prefab wall panel, framing and foundation company serving builders, developers and homeowners directly. This tool does not produce a quote, and no pricing is implied.

More Free Tools

Prefab vs. Stick-Built Calculator

Compare framing days and carrying costs between a prefab panel install and traditional stick framing on your project size.

Rain Delay Cost Calculator

Estimate what standing crew time and carrying costs could add up to while a stick-built frame sits open to the weather.

Build Timeline Estimator

Get a rough phase-by-phase schedule from permitting through handover, and see how framing method shifts the timeline.

Owner-Builder vs. GC Comparator

See how self-managed trade overruns and your own time stack up against a general contractor's markup.

Wall Panel Take-Off Estimator

Turn linear feet and wall height into wall area, a rough panel count and stud count before you send plans out.

Framing Material Take-Off

Rough studs, plates and sheathing sheets for a wall run, with a waste allowance you set.

Schedule Float Planner

Compare expected weather-lost days against the float in your schedule, using your own assumptions.

Wall Panel Weight Estimator

Estimate how much a framed and sheathed wall panel weighs, so crane and delivery conversations start from a real number.

Wall Effective R-Value Estimator

See how framing lowers the R-value of an insulated stud wall, and what continuous exterior insulation does to it.

Excavation Volume Calculator

Work out the dig volume, the loose volume after swell and the truckloads to haul for a foundation excavation.

Foundation Concrete Calculator

Add up the concrete in footings, foundation walls, pads and a slab, in cubic metres with an ordering allowance.