FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦
Request a Quote→778-403-6987→
Free tool for builders

Foundation Concrete
Volume Calculator

Add up the concrete in a house, garage or garden suite foundation: strip footings, foundation walls, pad footings and a slab, in cubic metres with an ordering allowance. Take the sizes from your foundation drawings. The defaults sketch a small crawl space foundation; set the slab area for a basement or slab-on-grade. Our foundation types guide explains the options, and the excavation volume calculator sizes the dig that comes first.

m

Total length, measured on the centreline.

mm
mm
m

Usually the same as the footing run. Set to 0 for a slab only.

m

Top of footing to top of wall.

mm

Square pads under posts or point loads.

m

Length of one side.

mm
m²

Basement, garage or slab-on-grade floor. 0 for a crawl space.

mm
%
Concrete to order
15.4 m³
about 20.1 cubic yards, including 5% allowance
Net concrete
14.64 m³
before the waste allowance
Footings and pads
4.56 m³
4.2 m³ strip footings, 0.36 m³ pads
Walls and slab
10.08 m³
10.08 m³ walls, 0 m³ slab
Request a Quote →Request a Quote

Estimate only, for budgeting and planning a pour. It is not engineering or a concrete order. Footing and wall sizes come from your stamped drawings and the BC Building Code, and your concrete supplier confirms the order quantity. OG Prefab is a prefab wall panel, framing and foundation company serving builders, developers and homeowners directly. This tool does not produce a quote, and no pricing is implied.

Assumptions

  • Each element is a simple box: run x width x thickness for footings, run x height x thickness for walls, side x side x thickness for each square pad, area x thickness for the slab.
  • Measure footing and wall runs along their centreline. Measuring outside faces counts the corners twice and overstates the volume slightly.
  • Rebar, form ties, keyways, step footings, thickened slab edges and openings are not modelled. Add them to the run or the waste allowance, or ask your supplier.
  • The waste allowance covers spillage, uneven sub-grade and form bulge. The default of 5% is a placeholder; your foundation contractor or supplier will tell you what they order over net.
  • Cubic yards are shown for comparison only. Ready-mix in BC is ordered in cubic metres (1 m³ is about 1.31 cubic yards).

Sources

More Free Tools

Prefab vs. Stick-Built Calculator

Compare framing days and carrying costs between a prefab panel install and traditional stick framing on your project size.

Rain Delay Cost Calculator

Estimate what standing crew time and carrying costs could add up to while a stick-built frame sits open to the weather.

Build Timeline Estimator

Get a rough phase-by-phase schedule from permitting through handover, and see how framing method shifts the timeline.

Owner-Builder vs. GC Comparator

See how self-managed trade overruns and your own time stack up against a general contractor's markup.

Wall Panel Take-Off Estimator

Turn linear feet and wall height into wall area, a rough panel count and stud count before you send plans out.

Framing Material Take-Off

Rough studs, plates and sheathing sheets for a wall run, with a waste allowance you set.

Panel Delivery Load Planner

Estimate panels per truck load and the number of loads for your job, to start the delivery conversation.

Schedule Float Planner

Compare expected weather-lost days against the float in your schedule, using your own assumptions.

Wall Panel Weight Estimator

Estimate how much a framed and sheathed wall panel weighs, so crane and delivery conversations start from a real number.

Wall Effective R-Value Estimator

See how framing lowers the R-value of an insulated stud wall, and what continuous exterior insulation does to it.

Excavation Volume Calculator

Work out the dig volume, the loose volume after swell and the truckloads to haul for a foundation excavation.