FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦FRAMING · FOUNDATIONS · BC✦INSURED✦PREFAB WALL SYSTEMS✦FREE QUOTE IN 48 HRS✦778-403-6987✦INFO@OGPREFAB.COM✦
Request a Quote→778-403-6987→
Free tool for builders

Schedule Float &
Weather Delay Planner

Compare how many working days you expect to lose to weather while the frame is open, on site-built framing versus a shorter on-site panel install, against the float in your schedule. Every input is yours - nothing here is a forecast. Pair it with the rain delay cost calculator.

days

Working days the frame is exposed if stick-built.

days

Working days on site for panel set, from your supplier or crew.

%

Your own assumption for the season you will be framing.

days

Spare working days in your schedule after framing.

$

Leave at 0 to hide cost. Enter your own figure, such as crew standing time or carrying cost.

Site-built: expected lost days
6
1 days over your float
Panel install: expected lost days
2
3 float days left
Request a Quote →Request a Quote

This planner multiplies the numbers you enter. It is not a weather forecast, a schedule guarantee or a promise about any panel supplier's turnaround. Panel fabrication lead time is outside the on-site days entered here. OG Prefab is a prefab wall panel, framing and foundation company serving builders, developers and homeowners directly. This tool does not produce a quote, and no pricing is implied.

More Free Tools

Prefab vs. Stick-Built Calculator

Compare framing days and carrying costs between a prefab panel install and traditional stick framing on your project size.

Rain Delay Cost Calculator

Estimate what standing crew time and carrying costs could add up to while a stick-built frame sits open to the weather.

Build Timeline Estimator

Get a rough phase-by-phase schedule from permitting through handover, and see how framing method shifts the timeline.

Owner-Builder vs. GC Comparator

See how self-managed trade overruns and your own time stack up against a general contractor's markup.

Wall Panel Take-Off Estimator

Turn linear feet and wall height into wall area, a rough panel count and stud count before you send plans out.

Framing Material Take-Off

Rough studs, plates and sheathing sheets for a wall run, with a waste allowance you set.

Panel Delivery Load Planner

Estimate panels per truck load and the number of loads for your job, to start the delivery conversation.

Wall Panel Weight Estimator

Estimate how much a framed and sheathed wall panel weighs, so crane and delivery conversations start from a real number.

Wall Effective R-Value Estimator

See how framing lowers the R-value of an insulated stud wall, and what continuous exterior insulation does to it.

Excavation Volume Calculator

Work out the dig volume, the loose volume after swell and the truckloads to haul for a foundation excavation.

Foundation Concrete Calculator

Add up the concrete in footings, foundation walls, pads and a slab, in cubic metres with an ordering allowance.